4.75″ Private Car Barn begins
Steve and Paul P begin the process of building a car barn for their collection. Eventually it will be five tracks wide and 36' long. This is the installation of the turnout from the mainline to serve it.
Steve and Paul P begin the process of building a car barn for their collection. Eventually it will be five tracks wide and 36' long. This is the installation of the turnout from the mainline to serve it.
This 5 track turnout is made using a pair of 3 way stub switches. The turnout was designed by Guy W and completed by Ken C.