Initial placement of the 5 track switch at the 1″ car barn
This 5 track turnout is made using a pair of 3 way stub switches. The turnout was designed by Guy W and completed by Ken C.
This 5 track turnout is made using a pair of 3 way stub switches. The turnout was designed by Guy W and completed by Ken C.
The Boy Scouts took the project to remove the brickwork of the grade crossing from the parking lot to the station. The crossing used to have a bend in the […]
This project was funded by members of the 4.75" gauge users. It holds enough ballast to fill about 12 ballast cars. That's enough for a day's worth of track maintenance. […]
Operating sessions on the One Inch and Gauge One layouts
Club Dinner at 5pm Saturday.